Piper PA-22-150 Rebuild Project 

15 Month project from March 1985 to June 1986

N1805P REBUILDING
N1805P REBUILDING
Viewed: 563 times.

N1805P When I flipped it over on Trail Lake [1985]
N1805P When I flipped it over on Trail Lake [1985]
Viewed: 542 times.

N1805P Flipping it back on its wheels. Out of sight is a small Snow Cat tracter doing the pulling.
N1805P Flipping it back on its wheels. Out of sight is a small Snow Cat tracter doing the pulling.
Viewed: 554 times.

N1805P Field repair. Replaced 2 left lift struts, prop, and rudder. Panel 4 we are repairing the wind shield w/duct tape and stitching w/safety wire.
N1805P Field repair. Replaced 2 left lift struts, prop, and rudder. Panel 4 we are repairing the wind shield w/duct tape and stitching w/safety wire.
Viewed: 593 times.

Trail Lake lodge - This is the place I flipped N1805P over on the lake [1985]
Trail Lake lodge - This is the place I flipped N1805P over on the lake [1985]
Viewed: 528 times.

N1805P Repaired and ready for ferry flt back to home base. Panel 3 is Al [my mechanic] ringing his hands [I put $ signs above his head..lol]. Al did me right. Panel 4 is me holding my damaged parts. The old bent up prop I left at the lodge and it was hanging above there bar as a conversation piece.
N1805P Repaired and ready for ferry flt back to home base. Panel 3 is Al [my mechanic] ringing his hands [I put $ signs above his head..lol]. Al did me right. Panel 4 is me holding my damaged parts. The old bent up prop I left at the lodge and it was hanging above there bar as a conversation piece.
Viewed: 556 times.

N1805P Start of complete recover/rebuild and repairs
N1805P Start of complete recover/rebuild and repairs
Viewed: 591 times.

N1805P Modified interior and cargo area.
N1805P Modified interior and cargo area.
Viewed: 540 times.

N1805P Top panels are the fuselage altho hard to tell. Bottom panels are the wings reapired.
N1805P Top panels are the fuselage altho hard to tell. Bottom panels are the wings reapired.
Viewed: 581 times.

N1805P Recovering and taping w/new fabric
N1805P Recovering and taping w/new fabric
Viewed: 563 times.

N1805P Painting - Primer coat
N1805P Painting - Primer coat
Viewed: 538 times.

N1805P Painted and clear coat on it. Installing hardware.
N1805P Painted and clear coat on it. Installing hardware.
Viewed: 553 times.

N1805P Strips painted
N1805P Strips painted
Viewed: 550 times.

N1805P Wings painted
N1805P Wings painted
Viewed: 539 times.

N1805P Finishing up. Ready to roll out for test flight.
N1805P Finishing up. Ready to roll out for test flight.
Viewed: 546 times.

N1805P After 15 months, 950 hours of my time and 8K+$'s 05Papa is ready for flight testing.
N1805P After 15 months, 950 hours of my time and 8K+$'s 05Papa is ready for flight testing.
Viewed: 637 times.

Powered by Gallery v1 RSS